How Long Does It Take To Build A Pool?
How long will it take to build my new pool?
Common questions asked at Fantasy Pools are “how long will it take to build my new swimming pool?” Well to find out read on…
- The planning process
- The type of pool (concrete for example)
- The time of the year
- Your local consent authority
- Other contractors
Let’s take a look at how these factors can influence your pool construction.
The planning process
Planning your new pool can be a lengthy process as there are many decisions to be made:
- Type of pool
- Shape
- Size
- Colour
- Where will you place the pool?
- If you’re building a new house, should the pool be installed before or after?
- What landscaping should happen before or after your pool is installed?
- What kind of pool fencing will work best for you?
It stands to reason that one of the biggest influencing factors of how long it will take before you are swimming in your new pool, is the time spent making decisions on your preferences. For some people pool planning can be a relatively quick process, but for others it can take months of discussion and design work, especially when a more complex concrete pool is involved.
The reality with swimming pools is that once they are in the ground, they are there forever, so it pays to give yourself a comfortable timeframe to ensure the right decisions are made.
The type of pool you choose
The length of time it takes to build your new pool is heavily influenced by the type of pool you choose. The construction time concrete pool can be significant.
While one benefit of concrete pools is that you are not limited by shape or size, it pays to remember that concrete pools, especially if you opt for detailed and complex shapes, may take several months or more to complete.
Of course, the installation of the pool is only one aspect of the pool project. It takes most households between 3 and 6 months on average to feel satisfied that they have completed their pool landscaping. That means that your pool can be up and running while you add the finishing touches at your own pace.
The time of the year
As you can imagine, when weather gets warmer more people start to think about swimming pools. In summer time, most pool builders are inundated with enquires from people who want to be swimming in their new pools as soon as possible. If you want to enjoy a lengthy first summer in your newly-built pool it’s a good idea to be talking with your pool builder at the June/July point or even earlier. During February/March for instance, many pool retailers are prepared to offer extra incentives to fill their books for winter.
Naturally, summer weather lends itself to construction. Many people choose to renovate, build and undertake other major projects when the weather is more stable. Because of this, the demand for mid-summer pool builds does increase dramatically and spaces fill up quickly.
That’s not to say that if you enquire in November (or even December) you will miss out on swimming that season, however it does pay to get in early!
Often in January or February people make the mistake of thinking “we’ve missed out on this summer so there’s no rush”. The reality of the situation is that if you plan your pool, install it early and then complete the landscaping in spring, you will have a pool area that is finished and ready for the entire next summer. No mess and no disappointment at a time when you want to be enjoying your pool.
Local consent authority
Every new pool that is built needs to be passed by the local authorities. Once you have completed your planning process, a development application (or complying development certificate, or permit submission) will need to be lodged. In most cases this is something that your pool builder will do for you (although separate fees may apply). This application needs to show the details of the construction process and outline how safety standards will be met.
The processing time for a permit varies from town to town and can also change depending on demand (4-6 weeks is not unusual). Summer is a busy time for the pool industry, processing times during peak season are often at the higher end of the guidelines you are given.
The construction of your pool cannot start until approval has been given. The earlier your application is submitted the more likely your project will be finished on time.
Other contractors
Most pool projects require several different contractors from electricians to concreters, fencers and pavers. The availability of your contractors can also have an effect on how long it takes before you are swimming. In most cases your pool builder will have a list of preferred contractors whom they trust and work closely with.
From time to time there are elements of a pool installation that will rely on another contractor completing. Because of this, we suggest having a firm plan before the project commences. If each contractor knows shows up and is aware of the timeline, you lessen the project delayed.